Charge-out rate
A charge-out rate is typically used to allocate the costs of a resource that is shared among multiple users. In construction, it is often used to calculate fees for a labour resource, taking into account unproductive and non-chargeable hours.
Chargeable hours are those that are spent providing direct services for a client. For example, a consultant may calculate their fee by multiplying the number of hours a particular job will take by a charge-out rate, which enables them to cover their costs. This rate must take into account holidays, sick leave and other non-chargeable work.
There is no fixed method of calculating a charge-out rate, however, a consultant for example, might calculate the annual cost of their labour (including salary, benefits and taxes), plus overhead costs and a profit allowance. Then, the total amount is divided by the total chargeable hours per year to arrive at a charge-out rate.
Tradespeople, such as plumbers or joiners, may charge separately for materials used.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
The challenge as PFI agreements come to an end
How construction deals with inherit assets built under long-term contracts.
Skills plan for engineering and building services
Comprehensive industry report highlights persistent skills challenges across the sector.
Choosing the right design team for a D&B Contract
An architect explains the nature and needs of working within this common procurement route.
Statement from the Interim Chief Construction Advisor
Thouria Istephan; Architect and inquiry panel member outlines ongoing work, priorities and next steps.
The 2025 draft NPPF in brief with indicative responses
Local verses National and suitable verses sustainable: Consultation open for just over one week.
Increased vigilance on VAT Domestic Reverse Charge
HMRC bearing down with increasing force on construction consultant says.
Call for greater recognition of professional standards
Chartered bodies representing more than 1.5 million individuals have written to the UK Government.
Cutting carbon, cost and risk in estate management
Lessons from Cardiff Met’s “Halve the Half” initiative.
Inspiring the next generation to fulfil an electrified future
Technical Manager at ECA on the importance of engagement between industry and education.
Repairing historic stone and slate roofs
The need for a code of practice and technical advice note.
Environmental compliance; a checklist for 2026
Legislative changes, policy shifts, phased rollouts, and compliance updates to be aware of.
UKCW London to tackle sector’s most pressing issues
AI and skills development, ecology and the environment, policy and planning and more.
Managing building safety risks
Across an existing residential portfolio; a client's perspective.
ECA support for Gate Safe’s Safe School Gates Campaign.
Core construction skills explained
Preparing for a career in construction.
Retrofitting for resilience with the Leicester Resilience Hub
Community-serving facilities, enhanced as support and essential services for climate-related disruptions.